1.
Andrade A, Rivera A, Saigua S, T. Castillo, Zárate A. Consequences in cost and time in construction projects due to the low level of BIM methodology use. RIC [Internet]. 2024Aug.28 [cited 2024Oct.4];39(2):151-60. Available from: https://revistaingenieriaconstruccion.uc.cl/index.php/ric/article/view/71423