[1]
Albayrak, G. and Özdemir, İlker 2018. Multimodal optimization for time-cost trade-off in construction projects using a novel hybrid method based on FA and PSO. Revista de la Construcción. Journal of Construction. 17, 2 (Aug. 2018), 304–318. DOI:https://doi.org/10.7764/RDLC.17.2.304.